Seeds, living plants & botanical goods · Growing guidance included

Sunny Lace

Five-packet growing plan for collection 04; review draft.

Working Chinese name: 阳光蕾丝

Formula status: current_listing_formula

WordPress status: draft (not published)

Stable collection mapping: No safe existing COL-* mapping

Product mapping: No product record

Each row is a separate seed packet. Packet seed count is not expected plant count, first-round sowing count, or guaranteed coverage.

Five-packet formula

PacketColor/typeRolePacket seed countBase guide
S03 · Lisianthusyellow (黄色)focal flower50Lisianthus
S20 · Craspedia / Billy Buttonsyellow (黄色)round accent50Craspedia / Billy Buttons
S11 · Snapdragonwhite (白色)vertical flower50Snapdragon
S08 · Zinniawhite (白色)cut flower50Zinnia
S12 · Strawflowerwhite (白色)fresh or dried texture100Strawflower

Total packet seed count: 300

Crop-by-crop sequence

Use your local last-frost date and the conditions below as separate clocks. The five packets are not a single sowing event.

CropStarting method and timingOutdoor move / direct-sow conditionSpacing and layout note
LisianthusBegin in protected indoor conditions with a fine, clean medium and dependable light. Keep the surface moist but airy; move seedlings on before roots become crowded. With the present seed form unverified, direct sowing is too uncertain to recommend. Plan a long indoor runway—about 12–17 weeks before the intended outdoor move. Published schedules differ, and the eventual series, flowering group, plug size, and climate should decide where within that window to start.Harden transplants and follow the crop-specific frost and temperature threshold above; do not use another packet’s date.For an initial cut-flower trial, 10–20 cm (4–8 in) is a reasonable working interval in a sunny, well-drained bed. Do not finalize height, support, container suitability, or commercial density until the series is known.
Craspedia / Billy ButtonsIf identity is confirmed, begin a limited indoor test about 6–8 weeks before planting out. Until then, do not turn this conditional pathway into packet instructions. For the reference crop, harden plants and move them outside after damaging frost risk. The real label may require a different hardiness and timing plan.Harden transplants and follow the crop-specific frost and temperature threshold above; do not use another packet’s date.A sunny, freely draining trial bed with about 23–30 cm (9–12 in) between plants is provisional for Craspedia only. Height and support remain blocked with the inventory identity.
SnapdragonStart indoors rather than relying on direct sowing. A 6–10-week lead is a planning range, not a fixed instruction; pot on young seedlings before crowding slows them. Harden gradually and choose the outdoor date from local conditions plus the confirmed flowering group. Cool-season performance cannot be inferred until the series and Group 1–4 response are known.Harden transplants and follow the crop-specific frost and temperature threshold above; do not use another packet’s date.Choose sun, drainage, and room for airflow. About 15–30 cm (6–12 in) can frame a branching trial; close single-stem production is a different system and should not be copied into a home bed.
ZinniaSow outdoors once frost danger has passed and the bed has warmed, or make a short indoor start about 3–5 weeks before planting. Avoid holding seedlings until they are root-bound. Move plants outside only after hardening and warm-season conditions are established. If the confirmed type responds well to repeat sowing, small follow-up sowings 2–3 weeks apart can be tested rather than assumed.Harden transplants and follow the crop-specific frost and temperature threshold above; do not use another packet’s date.Use full sun, drainage, and airflow as the starting conditions. A provisional 20–30 cm (8–12 in) interval suits many tall cutting types, but bushy, compact, or single-stem forms need a different layout.
StrawflowerA 4–6-week indoor start is the dependable default. Direct sowing may work in a long, warm season, but it shortens the harvest window and should be tested locally. Harden plants before placing them into a warm, draining bed after damaging frost risk has passed. Do not reuse a Utah tunnel schedule as a nationwide garden calendar.Harden transplants and follow the crop-specific frost and temperature threshold above; do not use another packet’s date.For tall cutting material, begin around 23–30 cm (9–12 in) in full sun and well-drained soil. Dwarf or compact cultivars require a separate container and spacing plan.

Frost-date sequence

  1. Start only the crops whose base guides call for an indoor lead; lisianthus, when present, begins much earlier than the others.
  1. Direct-sow cool-season, root-sensitive crops when local soil and frost conditions fit their guides. Keep those rows separate from warm-season crops.
  1. Harden transplants crop by crop. Move frost-sensitive warm-season plants outside only after local frost risk and temperature requirements are met.
  1. Use labeled blocks or rows. Do not apply one spacing to all five packets and do not expect one sowing date or one bloom date.

Layout and quantities

A 4 × 8 ft (about 3 m²) bed is a planning starting point, not measured coverage or a fixed plant count. Reserve room for paths, support and airflow. Decide first-round sowing, final plant count and backup seed separately after germination expectations, cultivar vigor and local space are known. The confirmed 300-seed packet total is not 300 plants and does not mean a second set is required for twice the area.

Harvest plan

Follow each linked base guide: focal flowers, airy flowers, foliage and dried pods reach useful stages at different times. Make several small harvests, hydrate fresh material promptly, and dry only the crops and stages explicitly supported by their guide.

Formula notes

  • Sunny Lace is the public name; Lemon & Lace is history-only.
  • Use yellow Craspedia target, not scabiosa.

Before release

Confirm supplier identity, cultivar/series, seed form, packet counts, stock, landed cost, local calendar and any support plan. This draft creates no buy link and changes no product copy, price, inventory or publication state.